Prelims: General mental ability · 38 में से Unit 34
Basic Numeracy and Data Interpretation
Number system, percentages, profit and loss, ratio, averages, interest, time-work-speed, mensuration basics, probability, and reading tables, bar graphs and pie charts (Class X level).
- Basic numeracy (numbers and their relations, orders of magnitude, etc.) (Class X level)
- Data interpretation (charts, graphs, tables, data sufficiency, etc.) (Class X level)
- Arithmetic in BPSC and JPSC General Studies
Number system
- Types of number: natural, whole, integers, rational (p/q), irrational (√2, π) and real numbers.
- Prime numbers: 2 is the only even prime. There are 25 primes below 100.
- Divisibility rules:
- 3 or 9: the sum of the digits is divisible by 3 or 9;
- 4: the last two digits are divisible by 4;
- 8: the last three digits are divisible by 8;
- 11: the difference between the sums of alternate digits is 0 or a multiple of 11.
- HCF and LCM: HCF × LCM = product of two numbers.
- Unit digit cycles: powers of 2 end in 2, 4, 8, 6; of 3 in 3, 9, 7, 1; of 7 in 7, 9, 3, 1; of 8 in 8, 4, 2, 6.
- Orders of magnitude:
- 1 lakh = 10⁵;
- 1 crore = 10⁷;
- 1 million = 10⁶;
- 1 billion = 10⁹ = 100 crore.
Percentages
- x% of y = xy/100.
- Successive change: net % = a + b + ab/100. Use a minus sign for a decrease. For example, +20% then −20% gives −4%.
- If A is r% more than B, then B is r/(100 + r) × 100 % less than A.
- Common fraction–percentage pairs:
- ½ = 50%
- ⅓ = 33⅓%
- ¼ = 25%
- ⅕ = 20%
- ⅙ = 16⅔%
- ⅛ = 12½%
- ⅑ = 11.1%
- ¹⁄₁₁ = 9.09%
Profit and loss, discount
- Profit % = (profit ÷ cost price) × 100.
- Selling price = CP × (100 + profit %)/100.
- Discount is calculated on the marked price.
- Successive discounts of a% and b% = a + b − ab/100.
Ratio, proportion and averages
- If a : b = 3 : 2, then a = 3k and b = 2k.
- Average = sum ÷ count.
- Weighted average = Σ(w·x) ÷ Σw.
- Mixtures (alligation): (cheaper : dearer) = (d − m) : (m − c), where m is the mean price.
Interest
- Simple interest: SI = PRT/100.
- Compound interest: A = P(1 + R/100)ⁿ, and CI = A − P.
- For 2 years: CI − SI = P(R/100)².
- Rule of 72: money doubles in about 72/R years.
Time, work and speed
- Work: if A does a job in a days and B in b days, together they take ab/(a + b) days.
- Pipes and cisterns: inlets are positive, outlets negative.
- Speed = distance ÷ time.
- To convert km/h to m/s, multiply by ⁵⁄₁₈. To convert m/s to km/h, multiply by ¹⁸⁄₅.
- Average speed for equal distances = 2xy/(x + y).
- Trains:
- To pass a pole, distance = length of the train.
- To pass a platform, distance = train + platform.
- Relative speed = sum of speeds (opposite directions) or difference (same direction).
- Boats:
- downstream speed = u + v;
- upstream speed = u − v.
Basic mensuration and geometry
| Shape | Area | Perimeter / volume |
|---|---|---|
| Rectangle | l × b | 2(l + b) |
| Square | a² | 4a |
| Triangle | ½ × base × height | — |
| Circle | πr² | 2πr |
| Cube | surface 6a² | volume a³ |
| Cuboid | surface 2(lb + bh + hl) | volume lbh |
| Cylinder | curved surface 2πrh | volume πr²h |
| Sphere | surface 4πr² | volume ⁴⁄₃πr³ |
Pythagoras: a² + b² = c². Common triples: (3, 4, 5), (5, 12, 13), (8, 15, 17).
Probability and counting
- P(event) = favourable outcomes ÷ total outcomes, from 0 to 1.
- Two dice give 36 outcomes. A sum of 7 is the most likely, at ⁶⁄₃₆ = ⅙.
- Permutation: ⁿPᵣ = n!/(n − r)!.
- Combination: ⁿCᵣ = n!/[r!(n − r)!].
Data interpretation
- Read the title, units and footnotes first (₹ crore? per cent? thousand tonnes?).
- Approximate. Options are usually far apart, so round to 2 significant figures.
- Common questions:
- % change = (new − old)/old × 100;
- share = part ÷ total × 100;
- ratio;
- CAGR ≈ (end/start)^(1/n) − 1;
- average.
- Pie chart: angle = share% × 3.6°.
- Data sufficiency: test each statement alone, then together. Do not solve fully; only decide whether it can be solved.
Worked example (table):
- Production (lakh tonnes): 2021: 40; 2022: 46; 2023: 50.
- Growth 2021–22 = ⁶⁄₄₀ = 15%. Growth 2022–23 = ⁴⁄₄₆ ≈ 8.7%.
- Average production = 136 ÷ 3 ≈ 45.3 lakh tonnes.
Exam tip: UPSC CSAT has about 25–30 maths and DI questions, and BPSC GS has about 10. Learn the formula sheet above and do 15 timed questions a day. Accuracy matters more than speed because of negative marking.